Near Critical Path
Like the Critical Path, a Near Critical Path is made up of Work Packages, Planning Packages, or lower-level tasks linked by schedule logic. They're ranked by duration: the second, third, fourth, and subsequent longest sequences of tasks from Time Now to the project end date. Where a schedule carries no date constraints, those same paths also hold the next-lowest Total Float, which is why the concept is often described in float terms instead. The two views separate once date constraints or multiple Working Calendars are in play, so duration ranking is the more reliable basis. Because a Near Critical Path is only slightly shorter than the Critical Path, a modest delay or resequencing can make it the longest — and therefore the new Critical Path.
Why it matters
Schedulers watch Near Critical Paths because they are the leading indicator of where a new Critical Path is likely to emerge. Ignoring them can mean being caught out when a secondary path suddenly becomes the one driving the finish date. They also matter for acceleration: the Critical Path is normally examined together with the secondary and tertiary paths, with mitigation applied where they intersect, since compressing the Critical Path on its own often just promotes the next path in line.
See also
FAQ
© 2026 forProject Technology, Inc.