Integrated Master Schedule (IMS)
The IMS ties every detailed task and milestone into a single logical network schedule, tracing directly back to the events, accomplishments, and criteria defined in the Integrated Master Plan (IMP) when one exists. It's meant to cover the full scope of a project's development, production or modification, and delivery activities. Because everything is networked together, the IMS can show how a delay in one area ripples through the rest of the project.
Why it matters
A well-built IMS is what makes schedule analysis — like finding the Critical Path or running a schedule risk assessment — possible in the first place. Without full network logic and traceability back to the IMP, a schedule can look complete on paper while hiding gaps that only surface once work is underway.